How Many Years to Build Tower Bridge London?

Tower Bridge in London was built over an impressive eight years from 1886 to 1894. This article delves into the journey of its construction and the obstacles faced along the way.

Introduction

The Tower Bridge in London is an iconic structure that has become synonymous with the city itself. Completed in the late 19th century, it stands as a testament to brilliant engineering and Victorian-era ambition. But how long did it take to build Tower Bridge, and what challenges did the builders face during its construction?

The Timeline of Tower Bridge Construction

Construction on Tower Bridge began in 1886 and was completed in 1894, taking a total of eight years to finish. The project was commissioned to accommodate the increase in vehicle and pedestrian traffic, exacerbated by the rising population of London.

Design and Planning Phases

One of the significant aspects that contributed to the construction duration was the preliminary design and planning. The design was the brainchild of architect Sir Horace Jones, who envisioned a combination of bascule and suspension bridge forms. Before the bridge’s groundbreaking, numerous designs were put forward, with Jones’s design ultimately approved in 1884.

Challenges Faced During Construction

The construction of Tower Bridge was fraught with challenges, including:

  • Financial Constraints: Initially estimated to cost £800,000, the final expense soared to over £1 million. Funding was a persistent issue, requiring careful management and financial oversight.
  • Engineering Innovations: The project demanded groundbreaking engineering techniques to ensure the bridge could rise and fall without compromising structural integrity.
  • Labor Issues: With thousands of workers employed on the site, labor strikes and shortage were common impediments that delayed progress.
  • Site Conditions: The construction site itself posed obstacles, including the working environment of the River Thames and the stability of the ground on which the bridge was to be built.

Construction Process

Building Tower Bridge required a variety of engineering disciplines. The construction process included:

  • Excavations: The first step involved excavating the riverbed to lay the foundations, which went down 30 meters.
  • Foundation Works: Over 1,100 piles were driven into the ground, supporting the massive stone towers.
  • Steel Framework: A complex steel structure was built to form the gantry, allowing the bascule sections to rotate effectively.
  • Bridge Decking: The wooden decking was laid over the steel framework, creating walkable surfaces for pedestrians and vehicles.
  • Control System Installation: Sophisticated mechanisms were installed to operate the bascule, allowing boats to pass beneath the raised bridge.

Completion and Inauguration

After eight years of hard work and determination, Tower Bridge was officially opened on June 30, 1894. The Lord Mayor of London, Sir John Peabody, performed the ceremonial opening, allowing pedestrians to cross the bridge for the first time. It was initially opened for foot traffic only, with vehicle traffic permitted later on.

Statistical Overview

Here are a few fascinating statistics about Tower Bridge:

  • Length: The main span of Tower Bridge is 200 meters (650 feet) long.
  • Height: The towers rise to 65 meters (213 feet) above the Thames.
  • Weight: The entire bridge weighs approximately 1,200 tons.
  • Traffic: It is estimated that over 40,000 vehicles and 21,000 pedestrians cross Tower Bridge every day.

Conclusion

In summary, Tower Bridge took a total of eight years to construct, from 1886 to 1894. It was a monumental achievement during its time, blending art, culture, and engineering to create a functional piece of infrastructure. Today, Tower Bridge not only continues to serve as a vital crossing over the Thames but also stands as a historical landmark cherished by Londoners and visitors alike.