Introduction

London Bridge is one of the most iconic landmarks in London, with a rich history that spans over 2,000 years. But have you ever wondered just how long it took to build each iteration of this famous bridge? In this article, we’ll explore the construction timeline of the various bridges that have existed at this site, from the Roman times to the present-day structure.

The Roman Bridge: 50 AD

The first recorded bridge at this location was built by the Romans around 50 AD, shortly after their conquest of Britain. This wooden bridge served as a key crossing point over the River Thames and was vital for trade and transportation.

  • Construction Duration: Approx. 2 years
  • Materials Used: Timber
  • Features: Simple design for foot and cart traffic

The Medieval Stone Bridge: 1209

Fast forward to the early 13th century, when King John authorized the construction of a more durable stone bridge in 1209. This bridge was a significant improvement over its Roman predecessor, made from local stone and featuring sturdy arches.

It’s worth noting that the construction took place amidst the backdrop of ongoing wars and challenges in the kingdom, yet it was completed relatively quickly given the circumstances.

  • Construction Duration: Approximately 30 years
  • Materials Used: Stone and timber
  • Features: 19 arches, houses, and shops along the bridge

The 18th Century Bridge: 1725

The medieval bridge served the city well for several centuries, but by the 18th century, it was showing signs of wear and overpopulation. In 1725, a new bridge was commissioned, designed by architect John Rennie. The construction of this bridge was marked by significant engineering innovation.

  • Construction Duration: About 6 years
  • Materials Used: Granite and stone
  • Features: Five elliptical arches and a grander design

Modern Era: The 1973 Bridge

In the 1960s, discussions began about the feasibility of a new bridge. The 19th-century bridge was struggling to accommodate modern traffic volumes and was deemed inadequate. The new London Bridge was completed in 1973 and boasts a modern design aesthetic.

  • Construction Duration: Approximately 3 years
  • Materials Used: Reinforced concrete, steel, and granite
  • Features: Built to handle increased vehicular and pedestrian traffic

Case Study: The Transfer of London Bridge to Arizona

One of the most incredible stories surrounding London Bridge involves its relocation. In 1967, the 1831 bridge was sold to American entrepreneur Robert P. McCulloch for $2.46 million. Dismantled and shipped piece by piece to Lake Havasu City, Arizona, the bridge was reconstructed in a project that took about three years. This case exemplifies the enduring legacy of London Bridge.

  • Bridge Sold: 1967
  • Transfer Duration: Approximately 3 years
  • Reason for Relocation: To become a tourist attraction

Statistics and Fun Facts

London Bridge has a storied history that extends beyond its mere construction:

  • Original bridge was a wooden structure that lasted over 100 years.
  • The medieval bridge was not only a crossing but also housed shops and homes—about 200 of them!
  • Today, more than 40 million vehicles cross the modern bridge annually.
  • The last major refurbishment occurred in 2000, enhancing safety features.

Conclusion

Building a bridge like London Bridge is no small feat. Across different eras, the time taken to build the structure has varied significantly due to advances in engineering, materials, and the increasing complexity of city planning. From its Roman beginnings to its modern iteration, London Bridge has stood the test of time and continues to be a vital part of London’s infrastructure and history.